Main Repair and Replacement

line-repair-rehab-and-replacement-content

Keystone installed 1,500 feet of 8″ C900 PVC pipe and a 100 foot 8″ HDPE road bore for system improvements on Fort Rucker Military Base. This installation was in a residential area requiring the reconnection of service lines and was accomplished with minimal service interruption. Keystone was responsible for all site work, including abandonment of existing system, driveway repairs, pressure testing, disinfection, and restoration.

main-repair-replacement-content